All clinical trials on the European Union Clinical Trials Register (EUCTR) must report their results in the registry within a year of completion. This site tracks who's doing this and who isn't. Learn more »
These trials completed more than 12 months ago and should have reported results. Some have, some have not.
These trials are not yet due to report results: some are ongoing, some completed within the past 12 months.
These trials have problematic data on the registry. Details why »
Status | Trial ID | Title | Completion date | Category |
---|---|---|---|---|
Not reported | 2019-002351-42 | An Observational, Follow-on Study to the MEDI4920 (D5100C00002) Study to Evaluate the Duration of Clinical and Pharmacodynamic Efficacy of 12 weeks of Treatment with VIB4920 in Subjects with Moderate ... | 2021-04-01 | due-trials |
Listed as ongoing, but also has a completion date and reported results | 2019-002713-19 | A Phase 2 Randomized, Double-Blind, Placebo-Controlled, Proof of Concept Study to Evaluate the Efficacy and Safety of VIB4920 in Subjects with Sjögren's Syndrome (SS) Studio proof of concept di fas... | 2023-03-10 | bad-data |
Reported results | 2019-003697-70 | A Phase 2, Randomized, Double-Blind, Placebo-Controlled, Mechanistic Insight and Dosage Optimization Study of the Efficacy and Safety of VIB4920 in Patients with Rheumatoid Arthritis (RA) | 2021-12-13 | due-trials |
Ongoing | 2020-000417-33 | A Phase 3, Randomized, Double-blind, Multicenter, Placebo-Controlled Study of Inebilizumab Efficacy and Safety in IgG4 Related Disease | not-yet-due | |
Ongoing | 2020-000949-14 | A RANDOMIZED, DOUBLE-BLIND, MULTICENTER, PLACEBO-CONTROLLED PHASE 3 STUDY WITH OPEN-LABEL PERIOD TO EVALUATE THE EFFICACY AND SAFETY OF INEBILIZUMAB IN ADULTS WITH MYASTHENIA GRAVIS | not-yet-due | |
Ongoing, reported early | 2020-005528-12 | A Phase 2 Randomized, Double-Blind, Placebo-Controlled Efficacy and Safety Study of VIB7734 for the Treatment of Moderate to Severely Active Systemic Lupus Erythematosus Estudio de fase II, aleator... | not-yet-due |